STAGING ENVIRONMENT
EXIT

Search Content

Use the search bar above, explore content using the categories below, or log in to find your favorites.

Create An Account

Thank you for choosing to create an account with us.

Please note that creating an account is optional, but helps us better tailor the content we show you.


Please enter your email address and choose a password.

By creating an account, you agree to our Terms and Conditions and our Privacy Policy

Log in

Tell us a little about yourself


Choose Areas of Interest

Please tell us a little more about your profession.

This is optional, but lets us better tailor content to your specific interests.


You can read our policy on data collection and privacy here.

Channels that Interest You

Finally, check which channels interest you so you can see more relevant content. Choose as many as you like. You can also come back here and edit these settings later.


Share Content

Share our content with your friends and colleagues using the links below.


Sign up Forgot your password?
Home STOP Making These Subfloor MISTAKES

STOP Making These Subfloor MISTAKES

Sometimes everything just lines up — the inspector, the weather, and the crew.

In this episode, we got surprise approval to cover the floor right before the rain hit. Then it was full speed ahead: rolling PWT I-joists, gluing and nailing AdvanTech X-Factor, and taping seams before the storm rolled in.

In this video you’ll see:

  • How we install subfloor the right way — gapped, glued, nailed, and taped
  • Why we use TetraGrip nails and polyurethane adhesive for a 100-year floor
  • How to work efficiently without rushing quality
  • Tips for organizing your lumber delivery for smarter framing days ahead

Whether you’re a homeowner, DIYer, or builder, you’ll pick up real-world framing tips that prevent squeaks, save time, and make your floor last as long as the house.

🎥 Shot on site with the Awesome Framers crew — Pacific Northwest
🪚 Materials: Huber AdvanTech X-Factor, PWT I-Joists, TetraGrip nails
📍 Stay tuned — next episode we start snapping lines for rake walls!

Watch how we beat the rain, passed inspection, and installed a 100-year subfloor in one day.

This episode shows our complete process — from glue and layout to taping seams before the storm rolled in. You’ll see real-world framing techniques, jobsite coordination, and lessons learned after hundreds of homes.

⏱️ Chapters:

  • 00:00 – Inspector Approval Just in Time
  • 01:20 – Floor System Overview (PWT I-Joists & LVLs)
  • 02:45 – Prepping for Subfloor Installation
  • 04:10 – Glue, Layout & First Row Setup
  • 06:05 – Jordan’s First Subfloor Install
  • 07:30 – The Beater Board Trick You Need to Try
  • 09:00 – Framer Soapbox: Doing It Right
  • 11:40 – Tools & Fasteners That Make It Last
  • 13:10 – Drone View + Builder Philosophy
  • 15:00 – Wrapping Up: Subfloor Complete
  • 16:10 – Rain Test: Did It Stay Dry?
  • 17:40 – Lumber Delivery & Layout Planning
  • 19:15 – Ready for Framing Tomorrow

Showing result 1 to 8 of 45