STAGING ENVIRONMENT
EXIT

Create An Account

Thank you for choosing to create an account with us.

Please note that creating an account is optional, but helps us better tailor the content we show you.


Please enter your email address and choose a password.

By creating an account, you agree to our Terms and Conditions and our Privacy Policy

Log in

Tell us a little about yourself


Choose Areas of Interest

Please tell us a little more about your profession.

This is optional, but lets us better tailor content to your specific interests.


You can read our policy on data collection and privacy here.

Channels that Interest You

Finally, check which channels interest you so you can see more relevant content. Choose as many as you like. You can also come back here and edit these settings later.


Home Flush Framing I Joists STOP! Here's Why

Flush Framing I Joists STOP! Here's Why

Have you ever tried to pull an I-joist dead-flush with the rim board, only to find the rim sitting slightly proud? It’s not a manufacturing defect—it’s designed that way for a critical structural reason.

In this video, we break down the full anatomy of a high-performance crawl space floor system. From continuous PWT-treated LVL mud sills and Simpson Titan HD screw anchors to engineered load paths, squash blocks, web stiffeners, and why "deeper is cheaper" when optimizing floor stiffness.

TIMESTAMPS

0:00 - Why Rim Board Is 1/16" Taller Than I-Joists
0:29 - Mud Sill Setup & PWT Treated LVL
2:16 - Ditching J-Bolts for Titan HD Screw Anchors
0:00 - Seismic Bearing Plates & Code Requirements
4:54 - I-Joist Layout & LVL Beams
6:16 - Floor Diaphragm & Fastening Schedules
6:51 - Load Paths: Squash Blocks & Web Stiffeners
8:41 - "Deeper Is Cheaper": Getting a Stiffer Floor
9:28 - The Truth About I-Joists and Fire Safety

KEY TOPICS COVERED

  • Gravity Load Separation: Why rim board is sized 1/16" deeper than I-joists
  • PWT Treated LVL Sills: Utilizing 60' lengths to eliminate splices and unnecessary anchor bolts
  • Post-Installed Anchors: Simpson Strong-Tie Titan HD screw anchors vs. traditional cast-in-place J-bolts
  • Load Path Engineering: Proper placement of squash blocks, web stiffeners, and 3x3 bearing plates
  • System Fastening Schedules: How floor diaphragms transfer loads down to the foundation
  • Floor Performance: How to achieve a stiffer floor without extra labor ("Deeper is Cheaper")
  • Fire Safety: UL assemblies and APA guidelines for engineered floor systems

RESOURCES & LINKS

APA – Engineered Wood Association Fire-Rated Assemblies: APA Fire-Rated Assemblies

Simpson Strong-Tie Titan HD Anchor Specs: Simpson Strong-Tie

Pacific Woodtech PWT Treated LVL Information: Pacific Woodtech

JOIN THE DISCUSSION: Have you ever caught yourself trying to flush frame an I-joist, or had an inspector question squash block heights? Let us know down below—are you framing 16" O.C. or using the "deeper is cheaper" approach at 24" O.C.?

LIKE & SUBSCRIBE for more real-world framing techniques, building science, and jobsite walkthroughs!

Connect With Me

Instagram: @awesomeframers
TikTok: @awesomeframers
YouTube: Pioneer Builders Inc
Website/Blog: AwesomeFramers.com
Company: Pioneer Builders

Showing result 1 to 8 of 45