Flush Framing I Joists STOP! Here's Why
Have you ever tried to pull an I-joist dead-flush with the rim board, only to find the rim sitting slightly proud? It’s not a manufacturing defect—it’s designed that way for a critical structural reason.
In this video, we break down the full anatomy of a high-performance crawl space floor system. From continuous PWT-treated LVL mud sills and Simpson Titan HD screw anchors to engineered load paths, squash blocks, web stiffeners, and why "deeper is cheaper" when optimizing floor stiffness.
TIMESTAMPS
0:00 - Why Rim Board Is 1/16" Taller Than I-Joists
0:29 - Mud Sill Setup & PWT Treated LVL
2:16 - Ditching J-Bolts for Titan HD Screw Anchors
0:00 - Seismic Bearing Plates & Code Requirements
4:54 - I-Joist Layout & LVL Beams
6:16 - Floor Diaphragm & Fastening Schedules
6:51 - Load Paths: Squash Blocks & Web Stiffeners
8:41 - "Deeper Is Cheaper": Getting a Stiffer Floor
9:28 - The Truth About I-Joists and Fire Safety
KEY TOPICS COVERED
- Gravity Load Separation: Why rim board is sized 1/16" deeper than I-joists
- PWT Treated LVL Sills: Utilizing 60' lengths to eliminate splices and unnecessary anchor bolts
- Post-Installed Anchors: Simpson Strong-Tie Titan HD screw anchors vs. traditional cast-in-place J-bolts
- Load Path Engineering: Proper placement of squash blocks, web stiffeners, and 3x3 bearing plates
- System Fastening Schedules: How floor diaphragms transfer loads down to the foundation
- Floor Performance: How to achieve a stiffer floor without extra labor ("Deeper is Cheaper")
- Fire Safety: UL assemblies and APA guidelines for engineered floor systems
RESOURCES & LINKS
APA – Engineered Wood Association Fire-Rated Assemblies: APA Fire-Rated Assemblies
Simpson Strong-Tie Titan HD Anchor Specs: Simpson Strong-Tie
Pacific Woodtech PWT Treated LVL Information: Pacific Woodtech
JOIN THE DISCUSSION: Have you ever caught yourself trying to flush frame an I-joist, or had an inspector question squash block heights? Let us know down below—are you framing 16" O.C. or using the "deeper is cheaper" approach at 24" O.C.?
LIKE & SUBSCRIBE for more real-world framing techniques, building science, and jobsite walkthroughs!
Connect With Me
Instagram: @awesomeframers
TikTok: @awesomeframers
YouTube: Pioneer Builders Inc
Website/Blog: AwesomeFramers.com
Company: Pioneer Builders
Share on facebook
Tweet
Email
Share on Linkedin