STAGING ENVIRONMENT
EXIT

Search Content

Use the search bar above, explore content using the categories below, or log in to find your favorites.

Create An Account

Thank you for choosing to create an account with us.

Please note that creating an account is optional, but helps us better tailor the content we show you.


Please enter your email address and choose a password.

By creating an account, you agree to our Terms and Conditions and our Privacy Policy

Log in

Tell us a little about yourself


Choose Areas of Interest

Please tell us a little more about your profession.

This is optional, but lets us better tailor content to your specific interests.


You can read our policy on data collection and privacy here.

Channels that Interest You

Finally, check which channels interest you so you can see more relevant content. Choose as many as you like. You can also come back here and edit these settings later.


Share Content

Share our content with your friends and colleagues using the links below.


Sign up Forgot your password?
Home Building on an Island

Episodes

Episode 8: Plumbing with Legend's SmartClick System and weatherproofing the Deck

Episode 8    

Learn about Legend's HyperPure piping and SmartClick fitting system to streamline deck construction and reduce installation time and tools needed. Visit legendvalve.com/smartclick for more information.

Episode 9: Final Framing and Two Additional Projects

Episode 9    

Wade and his team work on slate, Queen Anne renovation, and their own project, facing supply chain issues and ensuring warranty compliance for the Huber ZIP system.

Episode 10: Sidewall Cedar Shingles & the Island Power Grid

Episode 10    

Learn about shingling, water drainage, and powering an island in the latest episode of Building on an Island with Wade and Dan from WKP Construction. Sign up for the newsletter!

Episode 11: Logistics and Island History

Episode 11    

Before larger ferries, Block Island managed freight through smaller boats. If crew is short on supplies, they can order more or get assistance from nearby suppliers.

Episode 12: Stone Veneer, Electrical Rough-in, and Gas Piping

Episode 12    

The stone veneer from Delgado Stone is being installed on the exterior, while electrical and gas piping are almost complete. Insulation and wallboard are up next.

Episode 13: Insulation Install

Episode 13    

Wade discusses insulation materials, preferring closed cell spray foam in some areas. Rockwool mineral wool is used throughout the project. Wallboard installation is next.

Episode 15: New Island Projects and Interior Progress

Episode 15    

Progress on Yellow Kittens Tavern foundation work and helical piers set for deck support. Two island homes may be relocated or demolished. BOAI project features interior finishes advancing well.

Episode 16: Progress Update with Matt Risinger

Episode 16    

Wade Paquin and Matt Risinger discuss window ratings, fasteners, Rockwool insulation, millwork, and more on the progress of a Block Island home construction.

Showing result 1 to 8 of 45